Former Chevron and Texaco Marine Oil Terminal Facilities

State TrusteeState of Maine
Federal TrusteeDepartment of Commerce
AO Bureau

Also Known As

Incident Type

Oil

State

Maine

Case Status

Restoration

Location

Penobscot County

Authority

OPA

Contaminants of Concern Include

Oil

Affected DOI Resources Include

Anadromous Fish, Recreational Use Loss, Migratory Birds

Case Description

In 2006, the U.S. Coast Guard noticed a sheen on the Penobscot River and traced it back to the Chevron terminal oil facilities located in Hampden, Maine. Numerous discharges of oil and oil constituents to soil, sediment, groundwater, pore water, and surface water (the Penobscot River) at the Chevron Site were documented from 1973 to 2008. The oil and oil constituents caused injury to riverine, wetland and floodplain habitats, groundwater resources, and recreational opportunities, in the vicinity of the Chevron Site. In July 2016, the U.S. District Court of the District of Maine approved a settlement between the State of Maine, the United States of America, on behalf of the Department of the Interior (DOI) and the National Oceanic and Atmospheric Administration (NOAA), and five previous owners/operators of the Chevron Site. The approved settlement provided $880,000 for restoration of natural resources due to discharges of oil from the Chevron Site. a Final Restoration Plan and NEPA Evaluation was released to the public in January, 2020. The Trustees Preferred Alternative was to implement four restoration projects to improve riverine habitat in the Penobscot River Watershed.

Chevron Marine Terminal Facility, located along the Penobscot River in Hampden, Maine, Credit: U.S. Fish and Wildlife Service

Oily Sheen , Credit: USFWS


Page 1 of 2
 Document TypeDocument NameDocument Date

Factsheet

 Factsheet Factsheet on Restoration 12/12/2017

Agreement

 MOA/MOU Chevron Hampden Oil Terminal Trustee MOA 07/08/2016

Restoration

 Restoration Plan Former Chevron Draft Restoration Plan and NEPA Document 03/22/2019

Settlement

 Consent Decree Chevron Hampden Oil Terminal Consent Decree 07/07/2016
 

No publications have been entered for this case.

Map View

Case Contact

New England Ecological Services Field Office

Concord, NH | (603) 223-2541 | http://www.fws.gov/newengland/

If you have any problems, suggestions, or comments about our website please notify DOINRDAR@ios.doi.gov

Content Protected Copyright © 2024 NRDAR. Reproduction in whole or in part in any form or medium without express written consent of NRDAR is Strictly Prohibited.